Happenings
Southington High School Athletic Field
BSC Group, completing analysis of the Southington High School’s existing facility, attending community meetings, and preparing cost estimates, determined the most effective cost plan for the Town to replace its athletic facility with a synthetic turf field, renovated track, and new track and field events. BSC completed design of the existing facility demolition, grading and…Read MoreSimsbury High School Athletic Field
For improvements to the track and field stadium complex at a local high school, BSC Group was retained to design and provide construction phase services. To ensure the system performed to required standards, the Town of Simsbury replaced its aged synthetic turf system with a state-of-the-art synthetic turf system, rehabilitated its running track, and underwent…Read MoreRiverfront Park
BSC Group’s landscape architecture team assisted the Town of Orange in designing a .72-acre riverfront park on a former brownfield site. The community’s goals for the site included improved access to the waterfront area, as well as the creation of an attractive park setting for passive recreation and as such improvements include walking trails, benches,…Read MorePlainville High School Athletic Field
BSC Group provided design, engineering, bidding assistance, and construction administration services to the Plainville High School Athletic Facility in Plainville, Connecticut, for the installment of two new multi-sport all-weather synthetic turf fields, which hosts football, soccer, lacrosse, softball, and field hockey. BSC also provided renovations to the track and track events areas. Through submittal reviews,…Read MoreConcord River Greenway
BSC Group provided permitting and landscape design services for the Concord River Greenway, a multi-use pathway linking Downtown Lowell and the Rogers Fort Hill neighborhood through a network of walkways between key urban features. The greenway provides passive recreational opportunities associated with the river including walking, biking, bird watching, and access for rafting, kayaking, and…Read MoreChilde Hassam Park Design
The Friends of Childe Hassam Park and the City of Boston Parks and Recreation Department retained BSC to design a passive park for their South End neighborhood in Boston. This diminutive 2,670 square-foot park is located at the intersection of Columbus Avenue and Chandler Street and was the site of an existing passive park that…Read MoreBloomfield High School Athletic Facility
BSC Group provided design, engineering, bidding assistance, and construction administration services for the Bloomfield High School Athletic Facility in Bloomfield, CT, for the conversion of their stadium natural grass field to an all-weather synthetic turf field, as well as renovations to the track and track events areas. The BSC team provided master planning services for…Read MoreBlackstone Gateway Park Design
BSC Group worked with the City of Worcester to produce a master plan and design for an urban park with trails and boardwalks to support hiking, biking, and nature education activities. Located on 34 acres of conservation land in the City of Worcester, alongside the Middle River, the park offers public access through a series…Read MoreWalden Pond Resource Management Plan and Visitor Center
BSC Group was retained to prepare the ecological and traffic components of the Resource Management Plan and Visitor Services Master Plan for Walden Pond State Reservation, an approximately 371-acre Historic Landmark located in historic Concord, MA. BSC conducted an ecological evaluation of existing conditions around the pond and within the Reservation. The site contains mixed deciduous…Read MorePages: