Happenings
Hartford 21
BSC provided integrated civil/site engineering, transportation planning, permitting, and surveying services for the Hartford 21 mixed-use development, as part of the redevelopment of the Hartford Civic Center. The urban renewal project replaced a former retail mall with a 36-story, 262-unit condominium, as well as a 71,400 sf retail center and 39,000 sf of office space.…Read MoreFront Street District
The project aimed to incorporate a new satellite campus for the University of Connecticut within the urban fabric while maintaining the Hartford Times building, which holds significant cultural and historical value to the community. Collaborating with Robert A.M. Stern Architects, the design team envisioned a harmonious blend of greenery and structural elements, enhancing the aesthetic…Read MoreEMD Serono Pharmaceutical R&D Manufacturing Facility
EMD Pharmaceuticals retained BSC to perform mapping, site design, permitting, and preparation of construction documents for a 22-acre research and development and manufacturing facility located on Middlesex Turnpike in Billerica. The master planned facility includes a 500-space multi-level parking structure, four research and development buildings with a total of 220,000 square feet, and two manufacturing…Read MoreCambridge Discovery Park
BSC Group provided integrated services for The Bulfinch Companies’ Cambridge Discovery Park, a LEED-certified research and development facility with six new buildings, two new structured parking garages and a passive park. As part of the design, BSC prepared master plans for utilities, roadways, landscape, and drainage. Notably, BSC designed an innovative stormwater management system, which…Read MoreDerby Street Shoppes
The emergence of lifestyle centers as community gathering places has created the opportunity to transition aging malls and plazas to lively retail centers. The Derby Street Shoppes in Hingham exemplify this trend through the replacement of a dated shopping plaza with a 435,000-sf village-style complex. BSC’s integrated team provided civil engineering, permitting and survey services…Read MoreBedford Business Park
BSC civil engineers and landscape architects provided several conceptual designs for the Bedford Business Park that considered options for placement of outdoor spaces, gardens, and accessible routes connecting the buildings to exterior elements. The preferred design includes a large plaza and adjacent lawn area surrounded by a wall of evergreen trees, gardens and amenities such…Read MoreAtkins Road Subdivision
BSC designed and permitted a 23-lot residential cluster subdivision on 36.91 acres of undeveloped woodlands off Atkins Road in the Town of Sandwich. The project required permits from the Cape Cod Commission for a Development of Regional Impact (DRI), the Sandwich Planning Board (Definitive Subdivision and Special Permit) and the Natural Heritage & Endangered Species…Read MorePages: